View Assumptions   View/Change Labor/Material Cost

Without Improved Models
  Engr. Hours Tech Hours Mgmt Hours Cost Time / Schedule
(Weeks)
Design and Test Labor 66 32 6 $6,007 5.2
Material and Fabrication       $2600 2
Total for First Pass 66 32 6 $8,607 7.2
Total Number of Circuit Iterations Including First Pass (2 is minimum)
Estimated Schedule Time Per Re-work Iteration (Weeks) 3.6    
Total Cost and Schedule per Design $13,211   10.8

With Improved Models
  Engr. Hours Tech Hours Mgmt Hours Cost Time / Schedule
(Weeks)
Design and Test Labor 56 16 3 $4,455 3.75
Material and Fabrication       $1,600 2
Total for First Pass 56 16 3 $6,055 5.75
Total Number of Circuit Iterations Including First Pass
Estimated Schedule Time Per Re-work Iteration (Weeks) 3.875
Total Cost and Schedule per Design $6,055 5.75

Please provide us with feedback and suggestions on this calculator